
Add to Cart
Full automatic SUS 304 industrial type 5000LPH UHT production line with aspetic package
Description:
Shanghai beyond machinery co., ltd is specialized in supplying various kinds of milk processing line, including the pasteurized milk, UHT milk, flavored milk, yoghurt, cheese and butter, cream, condensed milk etc.
Shanghai Beyond can supply complete turnkey projects for customers, integrating with designing, equipment manufacturing, to installation and commissioning and also training the operators.
UHT milk process: milk transporting tank or vessels, milk filter and collection tank; cooling and storaging tank(milk chilly tank), Mixing/Blending and milk standardization, cream separation, UHT sterilizer(tubular type or plate type) homogenization, degassing, and filling
Brand Name: | Shanghai Beyond |
Model Number: | BY-UM |
Capacity | 5-200TPD |
Raw material | Fresh cow milk, buffalo milk, goat milk, camel milk or milk powder, or both mixed |
End product | Pure milk, UHT milk, long shelf life milk |
Shelf life | 35-40days, 3months, 6months, 12months (keep at room temperature ) |
Final product fat (%) | Semi-skimmed or double toned milk (1.5%); Full cream(3% or 6%); Toned milk(3%) |
SNF | 8.5%(min) |
Fresh milk inlet temperature | 4 ℃ |
Filling temperature | 20~30 ℃ |
Package for end product | plastic pouch / plastic bottle |
Certification: | ISO9001/CE/SGS |
Main material for machines | SUS304 or SUS316 |
Place of Origin: | China |
Manufacturer history | More than 10years |
Voltage | 380V 50Hz/110V 60hz/415V 50Hz |
Power consumption(Kw) | energy saving type, about 100-500kw, |
Operator needed | About 6-20persons |
Cooling water consumption | About 80-300M3 |
Steam consumption | About 300-5000T/H, |
Factory space needed | About 500-5000Sqm |
Warranty | 12 months after commissioning |
After sales service | Engineers available to service machinery overseas |
Minimum Order Quantity: | One set/one line |
Price: | negotiation |
Payment Terms: | T/T or L/C |
Supply Ability: | 50 Sets Per Season |
Delivery Time: | 50-100 working days upon receipt of payment and confirmed the drawings |
Packaging Details: | PE film wrapping, or carbon steel frame packing, or wooden case packing as to clients’ requirement |
Warranty | 12 months after commissioning |
After sales service | Engineers available to service machinery overseas |
Part of the Projects list or reference:
Project information | Place | Remark |
5000L/H UHT milk production line | Zimbabwe | Turnkey Project |
300 t/D liquid dairy production line | Henan Luohe | Turnkey Project |
100 t/D whole factory removal renovation project | Zhejiang Quzhou | Turnkey Project |
500 t/D dairy production line | Hubei Huanggang | Turnkey Project |
100 t/D liquid milk production line | Inner Mongolia JiNing | Turnkey Project |
400 t/D liquid milk production line | Xinjiang urumqi | Turnkey Project |
100 t/D dairy production line | Anhui huaibei | Turnkey Project |
200 t/D liquid milk production line
| Shandong ZaoZhuang | Turnkey Project |